Some operations of S&A industrial chiller

1.How to shield the Hall flow switch

2.How to replace the Hall flow switch circuit board

3.Check and clean the Hall flow switch

4.Check whether the there is any malfunctions in the waterpump of the industrial chiller

5.Set constant temperature mode

6.Replace the chiller water pump (CW5000, CW5200)

7.Measure the voltage of the Hall flow switch